Your home record · For homeowners
Track building permits through to closeout
Record every permit pulled for work on your home and follow it to closeout. An open permit can hold up a sale, so Mezzo flags ones that lapse.
You’ll be asked to sign in first.
Add a permit
- Open your home, choose More, then Permits. Open it
- Press + Add a permit.
- Describe What work does it cover? and choose the Type and Status (Applied, Issued, Inspection scheduled, Final inspection passed, Closed out, Denied or Expired).
- Add the Permit #, Town / jurisdiction, Inspector, Permit expires, and the Applied, Issued and Closed out dates.
- Link the Project and the Permit document, add Notes, and press Add permit.
Move it along
- Open permits are listed first, with an “open” badge and how long they’re valid.
- Press Update as it moves through inspections, and set Closed out with the date at the end.
- Press Delete and confirm to remove one.
Get the most from it
- Ask your contractor for the permit number when they pull it, and add it right away.
- A permit that expires without being closed out shows in Needs a look and costs points on the health score.
- Upload the permit itself on the Documents page, then link it here.
Questions
Why does an open permit matter?
Buyers’ lawyers and lenders often check town records. An open or expired permit can delay a sale until it’s closed out.
Words used here
- Booked
- Step four of a project: the hired pro has set a date for the work and the visit is on the calendar.
- Card hold
- A temporary hold on your card for the unpaid balance. It is not a charge: it guarantees the contractor and shrinks as you pay.
- Closeout
- What the contractor installed, the paint and finishes used, the warranty given and permits pulled, offered for the home record.
- Done
- The last step of a project: the work is finished. It is closed once the homeowner approves it and the final payment is made.
- Home health
- A score out of 100 built from upkeep, safety devices, aging systems, recalls, and permits and warranties, with what would raise it.
- Needs a look
- The things in your home record that need doing now (an overdue chore, an expired alarm), each with a way to get it done.
- Permit
- Permission from the town to do certain work, followed by an inspection. Track each permit until it is closed.
Did this help?
Related
- Upload and organize your home’s documents · Keep manuals, warranties, receipts, permits, insurance and the deed in one searchable vault. Mezzo reads each file to fill in its category and key dates, and reminds you before they pass.
- Keep your home’s history on the timeline · The timeline is everything that has happened to the home, newest first: Mezzo jobs, work you log yourself, permits, warranties, documents, equipment and paint. Each entry says how trustworthy it is.
- Understand your home health score · A score out of 100 for how well looked-after your home is, based on what you’ve recorded: overdue upkeep, safety devices, aging systems, recalls, permits and warranties. Needs a look lists each fix with a way to get it done.
- Keep the job in your home record · After the work, add what the contractor installed, the paint used, their warranty and permits to your home, and turn their recommendations into reminders.
- Set your DIY skill levels · Rate your hands-on experience in plumbing, electrical, carpentry and more. The DIY assistant uses it to decide how much to walk you through and when to recommend a pro.